Setting the trace level for a job

Trace logs contain status information logged by a job. The trace level set for a particular job determines the amount of information logged. The default trace level for a job is 1 (minimal trace information), with a maximum level of 10 (debug-level tracing). A trace level of 4 through 6 provides a medium level of debugging.

To set the trace level for a job:

  1. Connect to the repository and navigate to Administration > Job Management > Jobs.

    The system displays the Jobs list page.

  2. Select the job and then select View > Properties > Info.

    The system displays the Job Properties - Info page.

  3. Select a trace level from the Trace Level drop-down list.

  4. Click OK.

    The system displays the Jobs list page.